Estimate Print

Job Code

Jim

Date

6-18-2026
Section Number: 1 - Unassigned Section
LineDescriptionQuantityLabour CostMaterial CostSub Contract CostTotal Cost
0.000.000.000.00
Section Number: 2 - New Section
LineDescriptionQuantityLabour CostMaterial CostSub Contract CostTotal Cost
1 CABLE BASKET 100X60MM EXTERNAL RISER 2 126.36 0.00 0.00 126.36
2 CABLE BASKET 100X60MM INTERNAL RISER 34 2,148.12 850.00 0.00 2,998.12
3 LARGE ACCESS CONTROL PANEL 5 0.00 0.00 0.00 0.00
4 MEDIUM ACCESS CONTROL PANEL 15 36,328.50 0.00 0.00 36,328.50
5 SMALL ACCESS CONTROL PANEL 3 0.00 0.00 0.00 0.00
38,602.98850.000.0039,452.98
Section Number: 3 - New Section1
LineDescriptionQuantityLabour CostMaterial CostSub Contract CostTotal Cost
1 SMALL ACCESS CONTROL PANEL 3 0.00 0.00 0.00 0.00
2 CABLE BASKET 100X60MM EXTERNAL RISER 2 126.36 0.00 0.00 126.36
3 CABLE BASKET 100X60MM INTERNAL RISER 34 2,148.12 850.00 0.00 2,998.12
2,274.48850.000.003,124.48